Engineering Properties
General Comments
Functional and destructive testing can be performed on prototypes or pre-production diecastings but obviously the results with the latter will give a better indication of the likely performance of production components. For critical components therefore adequate time should be allowed following the production of diecast tooling for the testing programme considered necessary.